Start New Service

Houses with flags


 

Existing member & existing line/meter

If you’re already a San Patricio Electric Cooperative member and need to start electric service at an existing meter, please follow these directions:

  • Contact SPEC at 1-361-364-2220 or 1-888-740-2220 to disconnect your current meter and connect your new meter. Please have available your current account number and the location of the new meter.

  • Ensure a deposit or a letter of credit is on file with the Cooperative, if necessary.

 


 

New customer & existing line/meter

If you’re new to the SPEC service area and need to start service at an existing home or business, follow these instructions: 

  • Fill out a Membership Application and return it to San Patricio Electric Cooperative, Inc., PO Drawer 400, 402 E. Sinton Street, Sinton, TX 78387. or Fax to 1-361-364-3467.

  • If service is currently disconnected to the meter, you’ll need to know your 911 address to start service. Check here for instructions on how to obtain your 911 address.

  • Ensure a deposit or a letter of credit is on file with the Cooperative, if necessary.

  • Contact SPEC at 1-361-364-2220 or 1-888-740-2220 to connect your new meter. Please have the location of the new meter available.


 

New customer & new line construction is needed

If you’re new to the SPEC service area and need to start electric service for a newly constructed home or business, follow these directions:

  • Complete a Load Survey Sheet

  • Landowner must complete an Electric Line Easement - Obtain from SPEC

  • Follow the instructions on the 911 Address Contacts and Development Permit Contacts form to obtain the appropriate documentation.

  • The right-of-way must be clean & cleared 30' wide.

  • Ensure the construction cost is paid.

  • Confirm that a deposit or a letter of credit is on file with the Cooperative, if necessary.

  • Make certain the meter loop is built and at the construction site for inspection. Contact SPEC for the Meter Loop requirements.

After completion of the paperwork is received at the Cooperative and monies are paid, new line construction should take between 2-3 weeks.

We would love your feedback. Once your new lines are set up, please fill out a report card to let us know how the expereince was for you.

 


 

Existing member & new line construction is needed

If you’re already a SPEC member, but you need to start electric service at a newly constructed home or business, follow these directions.

After completion of the paperwork is received at the Cooperative and monies are paid, new line construction should take between 2-3 weeks.

 